Employee in the KTB warehouse scanning a labelled small-parts bin on a shelf

Spare parts management: have the right part ready – without a full warehouse

6 min read

Ask about the spare parts store in a plant, and you will often hear two complaints at once. The controller says: there is too much money sitting there. Maintenance says: what we need is never there. Both are frequently true at the same time.

Spare parts management resolves this contradiction. Not with more stock, but with the right stock.

What is spare parts management?

Spare parts management covers all the tasks needed to ensure that spare and wear parts are available when maintenance needs them. These include:

  • identifying the parts required,
  • assessing their criticality,
  • defining stock levels and ordering rules,
  • procurement and supplier management,
  • storing and looking after the parts,
  • and removing parts that are no longer needed.

The aim is a balance between availability and cost. A store that holds every conceivable part is safe but expensive. An empty store is cheap but risky.

Step 1: Determine criticality

Not every part is equally important. The central question is: what happens if this part is missing? This gives three classes:

Class Consequence of a failure Typical strategy
Hoch Plant stops, no workaround Stock in your own warehouse
Medium Restricted operation, emergency mode possible Small stock or a fast source of supply
Low Hardly any impact Order when needed

The assessment should also include replenishment lead time and availability on the market. A critical part that every distributor has in stock needs less inventory than a non-critical part with a long lead time that only one manufacturer makes.

Good spare parts management does not ask what you could have. It asks what you cannot do without.

Step 2: ABC and XYZ analysis

Two classic tools help to create order.

ABC analysis

It sorts parts by their share of value. A-parts are a few items with high value, C-parts many items with low value. A-parts deserve precise planning, C-parts processes that are as lean as possible.

XYZ analysis

It sorts by how regularly parts are consumed. X-parts are needed steadily, Z-parts very irregularly. Wear parts are often X-parts, repair parts often Z-parts.

Combined, this produces a matrix. An AX part, meaning valuable and regular, is suited to framework agreements with scheduled call-offs. A CZ part, meaning cheap and rare, should cause as little effort as possible. An AZ part, valuable and rare, is the hardest case. Here, only the combination of criticality and market knowledge helps.

Step 3: Define stock rules

Every part you stock needs clear rules:

  • Minimum stock: At what quantity is a reorder triggered?
  • Order quantity: How much is ordered each time?
  • Maximum stock: What is the most that may be held in stock?

The basis is past consumption, replenishment lead time and criticality. For rare repair parts, consumption is of little help. Here, the deciding question is how long a plant can be down and how long procurement takes in an emergency.

Step 4: Maintain master data

A spare parts store is only as good as its data. Every part needs at least:

  • the manufacturer and full manufacturer part number
  • a unique, understandable description
  • the installation location, meaning plant and assembly
  • key technical data such as dimensions, power, voltage or material
  • known alternatives, where approved

Duplicate items are a common problem. The same bearing appears under three descriptions because three people created it. Regular clean-ups pay off because they free up stock.

Step 5: Storage and care

Spare parts age, even when they are not installed. Elastomers become brittle, bearings can be damaged by vibration, electronics react to moisture. Check the manufacturer's storage instructions and inspect critical parts at fixed intervals.

It also pays to look closely on delivery. Are the part number, quantity and condition correct? Is the packaging intact? If you only discover at installation that the wrong part was delivered, you lose the time the store was supposed to gain you. That is why KTB inspects parts in its own central warehouse before they go to customers. More on this on our page on inspection.

The way parts are stored matters too. Small parts belong in labelled bins, large components in clearly marked locations. Shafts and rotors of larger motors should be turned at fixed intervals so that the bearings do not develop false brinelling marks. Details like these take little time and determine whether a part is still usable after years on the shelf.

Step 6: Remove what is no longer needed

Plants are decommissioned or converted. The spare parts often remain in the store. Check regularly which parts are no longer assigned to an active plant. These parts tie up capital and space. Some can be passed on to other plants, others sold or written off.

Five typical mistakes in spare parts management

  1. Stock based on gut feeling: Quantities are set because ‘it has always been that way’. Nobody checks whether the plant is even still running.
  2. Criticality without maintenance: Procurement assesses parts by value alone. The cheap part that stops an entire line slips through the net.
  3. No owner: The store belongs to everyone and therefore to no one. Stocks grow, data becomes outdated.
  4. Withdrawals without booking: On the night shift, a part is quickly taken and not booked out. The next day, the system shows stock that does not exist.
  5. No feedback from repairs: The workshop knows which parts really fail. If this information does not flow into spare parts management, planning misses reality.

Special cases: new plants and multiple sites

Initial spares for new plants

A new plant usually comes with a recommended spare parts list from the manufacturer. It is a good starting point, but not a law. Manufacturers make recommendations from their own perspective. Whether a part is critical for you depends on whether there are redundant plants, what your shift patterns look like and how quickly parts are available in your region. Review the list together with maintenance before you order. And set up the master data properly straight away. Nobody will catch up on it later.

Several plants with identical equipment

If identical machines stand at several sites, not every plant has to stock all critical parts itself. A shared stock that everyone can access reduces tied-up capital. The prerequisites are uniform part numbers across all plants and an agreed route for moving parts between sites in an emergency. With plants in different countries, import questions also arise, and these should be clarified in advance.

Metrics for an overview

A few metrics are enough to track developments:

  • Service level: How often was a requested part immediately available?
  • Inventory value and inventory turnover: How much capital is in the store, and how often does it turn over?
  • Share of non-moving parts: How many items have not been withdrawn over a longer period?
  • Downtime due to missing parts: How often and for how long was a plant down because a spare part was missing?

The last metric is the most important. It links the store to what it is really about: plants that keep running.

Store or supplier: the right mix

Spare parts management does not mean stocking everything yourself. For many parts, a reliable supplier with fast access to the market is the better solution. Your own store then concentrates on what is truly critical and hard to source.

KTB Europe has supported maintenance and procurement teams with spare parts procurement since 1976. We source across manufacturers, search internationally for hard-to-obtain parts and propose alternatives. You can read how we can support your spare parts management on our page on spare parts management.

Conclusion

Good spare parts management is not a warehouse project but a decision made part by part. If you know criticality, maintain your data and define stock rules, you often end up with less on the shelf and still more security.

Would you like to discuss your spare parts strategy or are you looking for a specific part? Use our contact page.

Frequently asked questions

What is meant by spare parts management?

Spare parts management covers all the tasks that ensure spare and wear parts are available when maintenance needs them. These include identification, assessing criticality, defining stock levels and ordering rules, procurement, storage, care and removing parts that are no longer needed. The aim is a balance between availability and tied-up capital.

How do you identify critical spare parts?

The deciding question is what happens in the event of a failure. If the missing part stops a plant with no fallback option, it is highly critical. Replenishment lead time, market availability and the number of sources of supply also come into it. A critical part with a long lead time and only one manufacturer almost always belongs in your own store.

What does an ABC/XYZ analysis achieve for spare parts?

ABC analysis ranks parts by share of value, XYZ analysis by how regularly they are consumed. Combined, it shows which parts need precise planning and which need lean processes. For spare parts, it should always be supplemented by a criticality assessment, because rare and cheap parts can still stop a plant.

How many spare parts should you keep in stock?

There is no one-size-fits-all number. The quantity depends on criticality, consumption, replenishment lead time and the number of parts installed. For regularly consumed parts, minimum and maximum stock levels help. For rare repair parts, what matters most is how long a plant can be down and how quickly the part can be sourced in an emergency.

MD

About the author

Mica Duarte

Senior Procurement Specialist at KTB Europe with over 15 years of experience in global MRO sourcing and supply chain management.

LinkedIn