It is a familiar scenario in international industry: a production plant comes to a standstill because a critical spare part no longer seems to be available. The original manufacturer no longer exists, the documentation is incomplete or the part is considered obsolete. What seems like a dead end to many is the beginning of a fascinating search for experienced MRO specialists.

Accepting the challenge

The procurement of supposedly "impossible" spare parts is not an exception in global industry - it is an everyday reality. There are many reasons why parts are difficult to procure:

  • Company mergers and acquisitions
  • Production settings
  • Outdated technologies
  • Relocation of production sites
  • Incomplete documentation

Strategies for successful searches

The key to success lies in a systematic approach based on three main pillars:

  1. International network A global network of locations and partners opens up access to markets and procurement sources that are not available locally. From Europe to America and Asia, various markets can be examined in parallel.
  2. Technical expertise Simply searching for part numbers is often not enough. It is crucial to understand the technical function in order to be able to identify alternative solutions. It is often possible to replace an "impossible" part with a technically equivalent or even improved component.
  3. Systematic research The search is methodical and includes:
  • Analysis of technical documentation
  • Research in international databases
  • Examination of company histories
  • Identification of alternative manufacturing options

From the individual solution to the strategy

Experience shows: The best solution is to avoid critical situations. Valuable insights for future procurement strategies can be derived from every complex search:

  • Early identification of critical components
  • Development of preventive procurement strategies
  • Development of alternative supplier structures
  • Evaluation of modern replacement solutions

Time as a critical factor

In industrial production, downtime often means considerable costs. That is why efficient processes in spare parts procurement are crucial:

  • Parallel search strategies in different markets
  • Pre-qualified partners for custom-made products
  • Optimized logistics processes for time-critical deliveries

Conclusion: solutions are possible

Experience in the international MRO business shows: Even seemingly "impossible" procurement tasks can be solved. The key lies in the combination of a global network, technical expertise and a systematic approach.

With the right strategy and an experienced partner, "impossible" spare parts become procurable components - and production downtimes become avoidable situations.

Frequently asked questions

Why are some spare parts no longer available?

Common causes are mergers and acquisitions of manufacturers, discontinued production, outdated technologies, relocated production sites and incomplete documentation. With older equipment in particular, this is not the exception but everyday reality. With a systematic search, many supposedly impossible parts can still be procured or replaced with an equivalent.

How do you find obsolete spare parts?

A systematic approach is successful: analyse technical documentation, search international databases and markets in parallel, check manufacturers' company histories and identify alternative manufacturing options. An international network opens up sources that are not available locally, such as remaining stock in other regions. Technical expertise also helps to identify functionally equivalent alternatives when the original no longer exists.

What is a technically equivalent spare part?

A technically equivalent spare part performs the same function as the original, matches its design and connections and withstands the same loads, but may come from a different manufacturer. Sometimes it is even an improved version. The prerequisite is a good understanding of the technical function and careful testing before use.

How can shortages of critical spare parts be avoided?

Critical components should be identified early and their availability checked regularly. Preventive procurement strategies, alternative suppliers and timely evaluation of modern replacement solutions make sense. Pre-qualified partners for custom manufacturing and parallel search strategies help to significantly shorten downtime in an emergency. In addition, every difficult search yields insights for future procurement strategies.

MD

About the author

Mica Duarte

Senior Procurement Specialist at KTB Europe with over 15 years of experience in global MRO sourcing and supply chain management.

LinkedIn