7 min read
In the maintenance office cupboard there is a binder labelled “Maintenance plan”. It was carefully put together years ago, with tables for every machine. Since then, hardly anyone has opened it. Maintenance still gets done – based on experience, on request and mostly when something is noticed.
The problem is rarely a missing plan. It’s a plan that doesn’t fit day-to-day reality: too extensive, too vague or without clear responsibility. A good maintenance plan is short enough to be used and precise enough to actually prevent failures.
In this guide, you will create a maintenance plan for your machines in eight steps. At the end you will find a template in table form that you can adopt straight away.
What is a maintenance plan?
A maintenance plan defines which task is carried out on which equipment, when, how and by whom . It is the central tool of preventive maintenance: tasks are planned before damage occurs, instead of repairing only afterwards.
The German standard DIN 31051 divides maintenance into four basic activities: servicing, inspection, repair and improvement. A maintenance plan usually covers the first two – i.e. tasks that slow down the depletion of the wear reserve (such as lubricating, cleaning, readjusting) and tasks that determine the actual condition (such as visual checks, measurements, functional tests). Maintenance terminology as a whole is defined in EN 13306.
Which maintenance strategy suits which equipment?
Before you plan tasks, it is worth taking a quick look at the strategy. Not every machine has to be treated the same way:
- Reactive maintenance: repairs are only carried out after a failure. This can make sense for non-critical, easily replaceable parts, such as a light fitting or a fan with a spare in stock.
- Preventive maintenance: servicing and inspection at fixed intervals. It is the basis of every maintenance plan and suits components with predictable wear.
- Condition-based maintenance: action is taken when readings such as vibration, temperature or pressure loss indicate incipient damage. It pays off above all for critical drives, pumps and gearboxes.
In practice, almost every maintenance plan is a mix. What matters is choosing the strategy deliberately rather than leaving it to chance.
Step 1: record your equipment
Start with a complete list of all equipment and important assemblies. For each machine, include:
- unique asset number and location
- manufacturer, type, year of manufacture and serial number as shown on the nameplate
- reference to the operating manual, circuit diagram and spare parts list
This list is more than a formality. Later on, it is the basis for every spare parts enquiry and for analysing faults.
Step 2: assess criticality
Not every machine deserves the same effort. Assess each one using simple criteria:
- consequences of a failure for safety, the environment and production
- is there redundancy or a fallback process?
- fault frequency to date
- availability of the most important spare parts
Then divide the equipment into three classes, for example A (critical), B (important) and C (non-critical). For A equipment you plan in detail; for C equipment, a few basic tasks are often enough. If you want to go deeper, use an FMEA for A equipment.
Step 3: gather manufacturer information and inspection obligations
The manufacturer’s operating manual is the first source of maintenance tasks and intervals. Add statutory and accident-insurance inspection obligations, for example from the German Ordinance on Industrial Safety and Health (BetrSichV) or the German accident prevention regulation for electrical installations and equipment (DGUV Vorschrift 3). These inspections have their own deadlines and documentation requirements, so they absolutely belong in the plan.
Note: work on electrical installations may only be carried out by qualified electricians or by electrically instructed persons under their supervision. Manufacturer instructions take precedence over general recommendations.
Step 4: describe tasks precisely
“Check pump” is not a maintenance task. A good description answers four questions:
- What exactly? “Measure bearing temperature on the pump housing”
- With what? “Infrared thermometer”
- How do you recognise a problem? A limit value or criterion, for example from the manufacturer’s data or your own experience
- What should be done then? “Inform shift supervisor, raise a fault report”
The more precisely a task is described, the less the result depends on who carries it out.
Step 5: set intervals
For each task, you define when it is due. Three types of interval have proven themselves:
| Interval | Trigger | Suitable for |
|---|---|---|
| time-based | daily, weekly, monthly, annually | visual checks, statutory inspections, cleaning |
| usage-based | operating hours, switching cycles, units produced | oil changes, filter changes, wear parts |
| condition-based | reading exceeds a limit value | bearings, gearboxes, drives with condition monitoring |
Start with the manufacturer’s figures and adjust the intervals based on your experience. If an inspection shows no findings over a long period, the interval can be extended. If failures occur between two maintenance visits, it is too long.
Step 6: assign responsibility and materials
Every task needs an owner – a person or a clearly named role. Operators can take on many simple tasks such as visual checks or cleaning. This takes the load off maintenance and sharpens their eye for changes on the machine.
Just as important: which materials are needed? Lubricants, filters, seals, V-belts or other wear parts should be ready for the maintenance date. A maintenance plan that falls down because a filter is missing is quickly abandoned.
Step 7: choose the right format
Whether paper, spreadsheet or maintenance software – the best format is the one that actually gets used on your site.
- Checklist at the machine: good for daily and weekly operator tasks.
- Spreadsheet: a good start for smaller companies, but prone to outdated versions.
- Maintenance software (CMMS): sends automatic reminders, generates work orders and stores the history. Pays off beyond a certain number of machines.
Step 8: introduce, evaluate, improve
Introduce the plan step by step, ideally starting with the A equipment. Talk to those involved about effort and benefit. Evaluate regularly:
- Were the planned tasks completed on time?
- What were the findings?
- Have failures and downtimes changed, for example measured with MTBF and MTTR?
A maintenance plan is never finished. After modifications, new equipment or recurring faults, it needs to be reviewed.
Typical scenario: getting the team on board
A company introduces a new maintenance plan. The first version contains more than a hundred tasks, many of them weekly. After a month only some have been done; the rest get postponed. In the second round, maintenance sits down with shift supervisors and operators. Together they remove duplicates, combine visual checks into one short inspection round and hand simple tasks over to the operators. The plan gets shorter – and is completed in full for the first time.
Maintenance plan template
The following template shows the structure with a few example rows. The intervals are illustrative – the manufacturer’s instructions and your own experience are what count.
| Equipment / assembly | Action | Type | Interval | Criterion / limit | Material | Responsible | Done on / by |
|---|---|---|---|---|---|---|---|
| Compressor K1 | Check condensate drain for correct function | inspection | weekly | drain opens audibly, no water in the network | – | Operators | |
| Compressor K1 | Replace intake filter | Servicing | as per manufacturer, operating hours | – | Filter element | Maintenance | |
| Conveyor belt F3 | Check belt tracking and tension | inspection | weekly | belt runs centrally, no slip | – | Operators | |
| Gearbox F3 | Check oil level and for leaks | inspection | monthly | oil level visible in sight glass, no leakage | Gear oil as per manufacturer | Maintenance | |
| Centrifugal pump P2 | Check bearing temperature and noise | inspection | monthly | limit as per manufacturer | – | Maintenance | |
| Control cabinet S1 | Clean or replace fan filter | Servicing | quarterly | filter visibly clean | Filter mat | Qualified electrician | |
| Electrical installation | Periodic inspection | inspection | according to risk assessment | as per inspection specification | – | Qualified electrician |
Typical maintenance plan mistakes
- Everything at once: a plan covering all machines in full depth is rarely finished. Start with the critical equipment.
- Vague tasks: “check” without a criterion leads to different results depending on who does it.
- No feedback loop: findings are noted but not evaluated. The plan never learns anything.
- Spare parts forgotten: materials for planned maintenance aren’t in stock, so the date gets postponed.
Securing spare parts for the maintenance plan
A maintenance plan only works if filters, seals, bearings and other wear parts are available in time. With older machines or equipment from foreign manufacturers, this is often precisely the weak point.
KTB Europe is a family business from Hamburg and has been sourcing spare parts and MRO materials of all brands worldwide since 1976. Send us part numbers, nameplate photos or descriptions, including as a list for an entire maintenance shutdown. If a part has been discontinued, we look for suitable alternatives. Find out more on our pages about MRO procurement and spare parts management. Related reading: how to identify critical failures with an FMEA in maintenance and how to measure the effect of your plan with MTBF and MTTR .
Send us your enquiry via the contact page.
Conclusion
A maintenance plan that actually gets used is concrete, prioritised and kept up to date. Record your equipment, assess its criticality, describe each task with a criterion and an owner, and set intervals that you adjust based on experience. The template above gives you a starting point – begin with the machine that worries you most today.
Frequently asked questions
What goes into a maintenance plan?
For each machine, a maintenance plan contains the specific tasks, the type of task, the interval, an inspection criterion or limit value, the materials required and the person responsible. Add a column for documenting completion. Statutory inspection obligations should also be included.
How do I set maintenance intervals?
The starting point is the manufacturer’s information in the operating manual. Depending on the task, time-based, usage-based or condition-based intervals are suitable. Based on findings and failures, you adjust the intervals over time to your actual operating conditions.
What is preventive maintenance?
Preventive maintenance means planning tasks such as servicing and inspection in advance, before damage occurs. The opposite is reactive maintenance, where repairs are only made after a failure. The maintenance plan is the central tool of preventive maintenance.
What software do you need for a maintenance plan?
To get started, a spreadsheet or a checklist at the machine is often enough. As the number of machines grows, maintenance software (CMMS) pays off: it sends automatic reminders, generates work orders and stores the history. More important than the tool is that the plan is used and maintained consistently.
What is the difference between servicing and inspection?
According to DIN 31051, servicing covers tasks that slow down the depletion of the wear reserve, such as lubricating, cleaning or readjusting. Inspection serves to determine the actual condition, for example through visual checks or measurements. Both types of task typically belong in a maintenance plan.
About the author
Mica Duarte
Senior Procurement Specialist at KTB Europe with over 15 years of experience in global MRO sourcing and supply chain management.
LinkedIn