Chessboard on an office desk with some pieces replaced by ball bearings and nuts

Strategic procurement: 7 spare parts misconceptions that cost money

6 min read

Strategic procurement has a firm place in many companies. For steel, plastic granulate or electronic components there are category strategies, market analyses and supplier portfolios. For spare parts there is often just one thing: habit. You order from the manufacturer or from the distributor maintenance has always known.

Yet the MRO area holds more strategic potential than many people think. The way there leads past seven misconceptions that persist in many procurement departments.

Strategic procurement in one sentence

Strategic procurement defines how a company sources a category over the long term: with which suppliers, on which terms, with what risk and towards which goal. Operational purchasing then turns this strategy into concrete purchase orders.

A proven tool is the Kraljic portfolio matrix. It sorts categories by two criteria: impact on profit and supply risk. This results in four quadrants.

Quadrant Profit impact Supply risk Typical MRO examples
Non-critical items low low Standard parts, consumables
Leverage items high low Standard bearings, lubricants in large quantities
Bottleneck items low high Special spare parts, discontinued components
Strategic items high high Large components such as gearboxes, rollers, drives

What stands out: many spare parts end up in the bottleneck quadrant. Their value is low, their failure risk high. Yet this is exactly the quadrant strategic procurement often neglects, because the sums look small.

Misconception 1: “Spare parts are an operational matter.”

Spare parts are ordered when something breaks. So, the logic goes, they are the business of maintenance and operational purchasing. There is nothing strategic to do.

That is not true. If you never look at your spare parts strategically, you end up with a long supplier list, unclear terms and no answer to the question of what happens when a critical part is missing. An MRO strategy does not have to be complicated. But it should exist.

Misconception 2: “The best price is the goal.”

In direct procurement, price is a key metric. For spare parts it is one of many. Often more important are:

  • availability when it really counts,
  • the process costs per purchase order,
  • the quality and authenticity of the goods,
  • and the cost of downtime if the part is missing.

A strategy that only looks at price optimises the smallest cost item and ignores the largest.

With spare parts, strategic procurement does not buy an item. It buys availability.

Misconception 3: “The manufacturer is the only source.”

Many buyers assume that a spare part can only be obtained from the machine manufacturer. For genuine custom parts that may be true. But a large share of the components in a machine come from suppliers: motors, bearings, valves, sensors, control assemblies. These parts are often also available directly on the market, sometimes faster, sometimes cheaper.

A strategy that takes this into account distinguishes between machine-specific parts and bought-in components and chooses the right sourcing channel for each.

Misconception 4: “Consolidating means cutting manufacturers.”

Supplier consolidation is a classic goal of strategic procurement. For direct materials this often means fewer manufacturers and higher volumes per manufacturer. For spare parts this does not work. The manufacturers are dictated by the equipment. You cannot decide to fit bearings from only one manufacturer in future if the machines are designed differently.

What you can consolidate is the interface. A multi-brand sourcing partner brings many manufacturers together behind one point of contact. The variety of parts remains, the variety of suppliers on your side shrinks.

Misconception 5: “MRO demand cannot be planned.”

Of course a breakdown cannot be predicted. But a large share of MRO demand can very well be planned:

  • Wear parts with known replacement intervals
  • Material for planned maintenance shutdowns
  • Spare parts for plant modernisations
  • Last time buys for discontinued components

If you separate this plannable share from the mass, you can treat it like direct materials: with framework agreements, call-offs and negotiations. For the unplanned remainder you then need fast, reliable channels.

Misconception 6: “Global sourcing means buying cheap in Asia.”

Global sourcing is often equated with cutting costs through low-wage countries. With spare parts it is about something else: availability. A part that is sold out in Europe may be sitting with a distributor in America. A component that European sales offers with a long lead time may be available sooner in Asia. And plants in Latin America often need European parts that nobody stocks locally.

Global sourcing in MRO therefore means knowing where which part is available on which terms. And having the ability to source it safely from there.

Misconception 7: “The risk lies with the supplier.”

Strategic procurement assesses supplier risks: financial strength, dependency, country risk. With spare parts, however, much of the risk lies elsewhere:

  • in missing or incorrect master data,
  • in product discontinuations that go unnoticed,
  • in unclear responsibilities between procurement and maintenance,
  • in spare parts stores whose contents nobody knows exactly.

These risks are in-house. A strategic procurement function that only looks at suppliers overlooks them.

What an MRO strategy can look like

A spare parts strategy does not need to be a thick document. Five building blocks are enough to start with:

  1. Segmentation: Assign your spare parts to the four quadrants of the portfolio matrix. Involve maintenance.
  2. Sourcing channels per quadrant: Catalogues for non-critical items, framework agreements for leverage items, secured multiple channels for bottleneck items, close partnerships for strategic items.
  3. Supplier portfolio: Decide which partners play which role. A multi-brand partner can cover many bottleneck and non-critical items.
  4. Data: Make master data quality a goal, not an afterthought.
  5. KPIs: Measure availability, process costs and downtime, not just purchase prices.

Procurement and maintenance: one team

The best strategy fails if procurement and maintenance work against each other. Procurement sees costs, maintenance sees risks. Both views are right. A joint MRO strategy brings both to the same table and creates an understanding that prevents many conflicts in day-to-day work. A practical start is a joint quarterly meeting to discuss the most important breakdowns, bottlenecks and supplier experiences.

The first 90 days

If you want to build an MRO strategy, you do not have to start with a major project. A realistic start in three months: in the first month, analyse the previous year’s purchase orders and segment the most important spare parts groups together with maintenance. In the second month, define sourcing channels for each segment and talk to your key suppliers. In the third month, set KPIs and start with a pilot area. After that you will not have a perfect strategy, but a solid foundation you can expand step by step.

Typical scenario: the new head of procurement

A new head of procurement wants to show results quickly. He tackles spare parts because he sees many suppliers and little control there. His order: from now on, three quotes per purchase order and approval by procurement. After a few weeks maintenance complains. Rush orders take longer, special parts are ordered from the wrong distributor, a shutdown is extended by a day.

The intention was right, the tool was wrong. A process that suits leverage items slows down bottleneck items. Had he segmented first, he would have set separate rules for each quadrant and won maintenance over as an ally.

Where KTB fits in

KTB Europe has been working as a sourcing partner for industrial customers since 1976. In an MRO strategy we typically take on the role of the multi-brand partner: for spare parts from many manufacturers, for hard-to-find and discontinued parts, for plants in different countries. Our aim is to reduce costs through optimised sourcing strategies without putting availability at risk.

Find out more on our pages on cost optimisation and procurement.

Conclusion

Strategic procurement does not end with direct materials. Especially with spare parts, where small values carry big risks, a strategic view pays off. If you know the seven misconceptions, you can avoid them and turn habit into a strategy.

Would you like to discuss your MRO strategy with an experienced partner? Write to us via our contact page.

Frequently asked questions

What is strategic procurement?

Strategic procurement defines how a company sources its categories over the long term. This includes market analyses, supplier selection, contract design, risk assessment and targets for cost and security of supply. Operational purchasing turns these requirements into concrete purchase orders. Strategic procurement thinks in years, operational purchasing in days and weeks.

What is the difference between strategic and operational procurement?

Strategic procurement develops category strategies, selects suppliers, negotiates framework agreements and assesses risks. Operational purchasing places orders on this basis, tracks delivery dates and resolves discrepancies. Each depends on the other. With spare parts the strategic level is often missing, so operational purchasing works without clear guidelines.

What is the Kraljic matrix?

The Kraljic matrix is a portfolio tool used in strategic procurement. It sorts categories by profit impact and supply risk into four quadrants: non-critical items, leverage items, bottleneck items and strategic items. Each quadrant calls for a different sourcing strategy. Many spare parts fall into the bottleneck quadrant, meaning low value with high risk.

How do you develop a strategy for spare parts?

Segment your spare parts together with maintenance by value and supply risk. Define suitable sourcing channels for each segment, such as catalogues, framework agreements or secured multiple channels. Define the role of your suppliers, improve your master data and measure availability, process costs and downtime instead of just prices.

MD

About the author

Mica Duarte

Senior Procurement Specialist at KTB Europe with over 15 years of experience in global MRO sourcing and supply chain management.

LinkedIn